Mikrofill at Basingstoke Fire Station

The existing Basingstoke Fire Station building dating back to 1966 has made way for the construction of a new £6m ultra-modern facility. The new station provides modern living quarters, a training tower and smoke training building. To maintain continuity of service during construction the existing training facilities were converted into the fire-fighters’ temporary home.

Part of the new services package carried out by mechanical contractor J & B Hopkins Ltd was the installation of an indirect EXTREME 300 litre HWS ‘loading cylinder’. The EXTREME is designed to maximise condensing boiler efficiency by operating at a Δt of 30°C (80/50°C) via its integral stainless steel plate heat exchanger. Capable of producing in excess of 2300 l/hr at 60°C the unvented cylinder comfortably accommodates the station’s peak hot water demand in the changing rooms and kitchen area.

The EXTREME was supplied c/w an unvented kit and a factory fitted single phase 3kW immersion heater.

Naturally inspired efficiency

Innovative UK designers and manufacturers of hot water loading systems, dosing pots, pressurisation equipment & booster set range. You can expect nothing but the best product, using the latest technology manufactured to the highest quality standards, resulting in the most reliable solution available.

Call 03452 606020