Mikrofill at Newport girls high school

Newport Girls’ High School in Shropshire was founded in 1920 to provide a grammar school education. The School continues to follow this ethic today with an appropriately challenging curriculum taught in a safe and supportive environment.

To combat a lack of permanent accommodation, plans were passed for the building of an extension. Completed in late 2012 the scheme included new classrooms, a multipurpose sports hall/assembly room and changing facilities all sympathetic to the original construction.

Mikrofill supplied 2 No ETHOS FS 550 kW condensing boilers which provide LPHW to both the new extension and parts of the original building. With an unsurpassed premix burner modulation of 20 > 1 per boiler and an output capability of 700 > 17.5kW, the boilers ensure the building load is accurately matched whatever the season.

The new stainless steel boilers were complemented by the installation of a Mikrofill pressurisation device that incorporates an expansion vessel and service drain valve.

The mechanical installation was carried out by building services contractor Dodd Group of Telford.

Naturally inspired efficiency

Innovative UK designers and manufacturers of hot water loading systems, dosing pots, pressurisation equipment & booster set range. You can expect nothing but the best product, using the latest technology manufactured to the highest quality standards, resulting in the most reliable solution available.

Call 03452 606020