Moorgate Academy uses Mikofill

The recently completed “Moorgate Primary Academy” in Tamworth prides itself on being a very friendly school with caring and supportive staff. The academy’s vision is simple; achieve, challenge, enjoy! Moorgate delivers this aim by providing a safe, secure and nurturing environment for children to develop into learners for life.

Constructed by Interserve, the build comprises state of the art classrooms, dance studios, library and a “breakout space” for group activities.

RPS (B/ham) carried out the mechanical design that included 3 No ETHOS 110kW condensing boilers c/w a “Mikrovent 250” low loss header & air dirt separator. With a combined modulation of 30 > 1 across 330kW the stainless steel boilers ensure optimum load matching at all times. The HWS demand was catered for by the introduction of 3 “EXTREME” loading cylinders. The stainless steel generators operate on a primary Δt of 30°C to maximise the condensing boilers efficiency. Each unvented cylinder is set to produce in excess of 2000 l/hr and over 600 litres over a 10 minute peak period. The equipment was installed by Leicester based contractor Mellor Bromley Mechanical Services.

Naturally inspired efficiency

Innovative UK designers and manufacturers of hot water loading systems, dosing pots, pressurisation equipment & booster set range. You can expect nothing but the best product, using the latest technology manufactured to the highest quality standards, resulting in the most reliable solution available.

Call 03452 606020