Oaks Nursery in Kent

Oaks Nursery is a brand new building situated on the University of Kent, Canterbury Campus catering for all ages of preschool children.Its clever use of natural materials and organic colours both inside and out complement its beautiful surroundings.

Sussex based mechanical services consultant Hamson JPA specified Mikrofill LPHW production equipment within their plantroom design. This included 2No ETHOS 50kW condensing boilers c/w Mikrovent low loss header/air & dirt separator and pressurisation package.

The HWS requirement was covered by an EXTREME 200 litre loading cylinder and unvented kit. In turn the loading cylinder encourages maximum boiler efficiency when producing HWS.The installation was carried out by long standing mechanical contractor Grummant Heating & Plumbing Services Ltd.

Naturally inspired efficiency

Innovative UK designers and manufacturers of hot water loading systems, dosing pots, pressurisation equipment & booster set range. You can expect nothing but the best product, using the latest technology manufactured to the highest quality standards, resulting in the most reliable solution available.

Call 03452 606020