Products in action – Tewkesbury C of E Primary School

Situated in the centre of Town, the primary school caters for children from all areas of Tewkesbury. Its vision includes that every child is valued, challenged and nurtured to aspire to reach their full potential as a responsible member of the global community.

During the summer of 2014 the schools existing heating plant was upgraded with 2No ETHOS 110kW wall mounted condensing boilers c/w a Mikrovent loss header/air and dirt separator. The boilers provide a total modulation of 20 to 1, a seasonal efficiency in excess of 95% and come complete with an integral cascade controller. Designed by Atkins (Bristol office) and installed by Hewer Management facilities Ltd the new equipment provided LPHW heating throughout the school.

In addition the boilers were supplied with free standing frames, a cascade sensor and a “Mikrofill 250” pressurisation package.

Naturally inspired efficiency

Innovative UK designers and manufacturers of hot water loading systems, dosing pots, pressurisation equipment & booster set range. You can expect nothing but the best product, using the latest technology manufactured to the highest quality standards, resulting in the most reliable solution available.

Call 03452 606020