News

RYEDALE SWIMMING POOL main image
 

RYEDALE SWIMMING POOL

To encourage more people to get involved with sport and exercise, Ryedale District Council decided that updating the heating & hot water systems at the Ryedale Swimming Pool in Pickering would play a key part in improving the services to the public and reducing energy costs.

Cheshire based Consulting Engineers, Preston Lee Chambers, were tasked with designing a new heating and hot water system to replace the inefficient cast iron plant and chose Mikrofill to supply new energy efficient hot water cylinders as well as boilers as back up to the CHP plant and solar thermal installation.

Long established engineers , H Pickup Mechanical & Electrical Services of Scarborough, expertly installed 2No Ethos FS 350, floor standing boilers, providing a maximum output of 700kw and a minimum of 35kw (20>1 turndown ratio) ensuring excellent load matching and efficiency throughout operation.

The boilers also provided LPHW to 2No Extreme 300 hot water loading systems producing 2370 litres an hour at 60°c whilst keeping the boilers in condensing mode.

For more information on these and other Mikrofill Ethos products please contact sales on 08452 606020 or visit www.mikrofill.com

 
 

BACK TO NEWS