News

MIKROFILL AT LANGLEY PARK SCHOOL main image
 

MIKROFILL AT LANGLEY PARK SCHOOL

Over the last couple of years, the Langley Park School for Boys underwent a major refurbishment with the secondary school being demolished and rebuilt with a new state of the art performance space.

A new Sport England sports hall was built adjacent to the Phythian Building which was retained and refurbished to bring in line with the new builds.

Design & Build experts LJJ Limited of High Wycombe, Buckinghamshire, decided Mikrofill’s technologically advanced floor standing boilers and Extreme loading systems were the ideal plant equipment to be installed in both the new school and refurbished Phythian building.

2 No. Ethos FS 350kw stainless steel condensing boilers were installed in the new school and as well as generating heat for numerous areas, the floor standing boilers provide LPHW to a bank of Rapide Extreme hot water loading systems. The Extreme loading systems ensure the boilers maintain condensing mode whilst they each produce domestic hot water in excess of 2570l/hr at 60°C.

A further 2 No. Ethos FS 350kw boilers were installed to serve the Phythian & Sports Hall buildings along with a Mikrovent 750 low loss header incorporating integral air & dirt separation.

Together, the two boilers in each building produce a maximum output of 700kW and a minimum of 35kW (20 > 1 turndown ratio) ensuring excellent load matching and efficiency throughout operation.

To find out more about these or any other Mikrofill products, please contact the sales department on 08452 606020 or go to www.mikrofill.com 

 
 

BACK TO NEWS