Ethos 70-130KW

 

Ethos 70-130KW wall mounted boiler

Designed and manufactured in the UK the Ethos stainless steel wall mounted boiler range has been developed to meet the requirements of today’s commercial buildings. The unsurpassed premix burner modulation of 10 > 1, integral shunt pump and ease of installation ensures the Ethos range is the first of its kind to exceed industry expectations.

The Ethos wall mounted boiler range offers individual outputs from 70-130kW and multiple outputs to 780kW all with onboard boiler cascade control.

 

Features

Benefits

Available in 70, 90, 110 and 130kW models  Installation options allowing  7 – 780kW
10 > 1  burner modulation Seasonal efficiency in excess of 96%
Stainless steel heat exchanger  5 year heat exchanger warranty
Integral boiler shunt pump   Can operate upto a ∆t of 35⁰C
Onboard boiler cascade control Boiler load evenly matched
Sealed combustion air system    < 48 dba

  

"Unsurpassed premix burner modulation of 10 : 1"

 

 

 
 
 

TECHNICAL DATA

General
 
Model   Ethos 70 Ethos 90 Ethos 110 Ethos 130
 
Dimensions (Height x Width x Depth) mm 905 x 530 x 475 905 x 530 x 675
Water Content of Appliance litre 7.0  8.8 10.7 12.4
Weight (Empty) kg 67 91 102 116
Flow/Return Connections BSP ¾”

1¼”

1¼" 1¼"
Gas Connection BSP ¾” ¾" ¾" ¾"
Flue Connection mm 80 100 100 100
Air Supply Connection mm 80 100 100 100
Concentric (Optional) mm 80/125 110/150 110/150 110/150
Power Consumption W 370 370 370 420
Electrical Supply V 230 230 230 230
Frequency Hz 50 50 50 50
Fuse Protection A 6 6 6 6
Maximum Fan Speed RPM 6600 6200 6750 6200
Minimum Fan Speed RPM 1000 900 900 950
 
Heating Performance
 
Nominal Heat Input (Nett) kW 7.0 - 70.0 9.0 - 90.0 11.0 - 110.0 13.0 - 130.0
Nominal Heat Output at 80/60°C kW 6.8 - 68.4 8.8 - 87.5 10.7 - 106.9 12.8 - 127.7
Nominal Heat Output at 50/30°C kW 7.7 - 76.8 9.7 - 97.2 11.9 - 118.8 14.0 - 140.4
Maximum Gas Consumption (G20) m3/hr 7.4 9.4 11.5 13.6
Maximum Gas Consumption (G25) m3/hr 8.6 10.9 13.4 15.8
Maximum Gas Consumption (G31) m3/hr 2.9 3.7 4.5 5.3
 
Technical Data
 
Flue Gas Dew Point °C 52 52 52 52
Flue Temperature at 80/60°C (at ambient temperature of 20°C) °C 75 75 75 75
Flue Material Temperature Class   T120 T120 T120

T120

Permitted Maximum Resistance of Flue System* Pa 140* 140*

200*

200*
Condensation pH Value   3.0 -5.5 3.0 -5.5 3.0 -5.5

3.0 -5.5

Maximum CH Flow Temperature °C 90 90 90 90
CH Water Pressure (Min/Max) Bar 0.5 - 4.0 0.5 - 6.0 0.5 - 6.0

0.5 - 6.0

Minimum/Maximum Gas Pressure (G20) mbar

17 - 20

17 - 20 17 - 20 17 - 20
Minimum/Maximum Gas Pressure (G25) mbar

17 - 20

17 - 20 17 - 20 17 - 20
Minimum/Maximum Gas Pressure (G31) mbar

30 - 50

30 - 50 30 - 50 30 - 50
 
Environmental Data
 
Flue Gas CO2 Content (G20) % 8.4 8.4 8.4 8.4
Flue Gas CO2 Content (G25) % 8.4 8.4 8.4 8.4
Flue Gas CO2 Content (G31) % 9.5 9.5 9.5 9.5
NOx Levels mg/kW 33.0 33.0 33.0 33.0
Maximum Efficiency (Nett Non Condensing) % 97.7 97.2 97.2 98.2
Maximum Efficiency (Nett Condensing) % 109.7 108.0 108.0 108.0
Seasonal Efficiency % 96.79 95.46 95.46 95.63

* With this resistance value the heat output will remain within the specications indicated on the dataplate; if the resistance is higher, the heat output will drop.

 

MIKROFILL AT WALLBROOK PRIMARY SCHOOL

03/12/2018

Wallbrook Primary School is situated in Coseley, in the heart of the Black Country. The school offers an exciting curriculum for children between 5 and 11 years of age ensuring the curriculum caters for the needs of all pu. . .

MIKROFILL EQUIPMENT AT SHIPSTON HIGH SCHOOL

02/07/2018

Shipston High School provides a safe, supportive and nurturing environment that enables every pupil to grow personally and academically. In 2017 the construction of a two-storey block, featuring nine new class. . .

MIKROFILL EQUIPMENT AT PALACE THEATRE

01/05/2018

The Palace is a 420 seat theatre with a Grade 2 listed auditorium situated in the heart of Redditch’s town centre. Operated by Place Partnership the theatre boasts all the modern comforts you’d expect including an inti. . .

MIKROFILL RE-PLANT AT DOBBIES

26/03/2018

Dobbies in Chesterfield is within easy reach of the Derbyshire countryside, situated just off the A616 between Balborough and Clowne. The naturally large gardening area is further complimented by a substantial aquatics department with a wo. . .

MIKROFILL SUPPLIES BROADWAY GOLF CLUB

31/01/2018

Established in 1895 on an escarpment with wonderful views across the Vale of Evesham to the Malvern Hills & Black Mountains, Broadway is one of the finest members’ golf clubs in the Cotswolds.. . .

INCEPTION TO COMPLETION PROGRAMME

30/10/2017

Inception to Completion at Goodyers End Primary School. . .

MIKROFILL AT GOODYERS END PRIMARY SCHOOL, WARWICKSHIRE

30/10/2017

Goodyers End Primary School is a Community school that was established in 1996 following the linking of Goodyers End First & Middle Schools. The school has a team of hardworking and co. . .

MIKROFILL AT CLUB 3000 BRISTOL

03/10/2017

With a dozen clubs nationwide, Club 3000 Bingo in Bristol is the latest branch to benefit from a plant room overhaul.. . .

MIKROFILL SUPPLY BRITISH GYPSUM

30/08/2017

British Gypsum, part of the Saint-Gobain group, is the UK’s leading manufacturer of interior lining systems. The company produces gypsum based products including plaster, plasterboard and ceiling partitions. It’s Robertsbridge sit. . .

The Place Kings Cross

04/07/2017

Located in the heart of London, The Place is a creative powerhouse for dance development that is leading the way in dance training, creation and performance. . . .