Extreme loading systems

 

EXTREME LOADING SYSTEMS

The Extreme loading system addresses and overcomes all of the disadvantages of the traditional coil type cylinder, whilst remaining simple and straight forward to install. In addition the operating principle ensures the efficiency of a condensing boiler is optimised during the production of hot water.

The Extreme produces exceptional flow rates in excess of 2500 litres per hour at 60⁰C.

Mikrofill’s uncompromising approach to quality materials, design flexibility and engineering excellence has resulted in the Extreme, the new standard in hot water generation.

INJECTION DYNAMICS

Introducing ‘INJECTION DYNAMICS’, a breakthrough in domestic hot water technology. By utilising this revolutionary method of heating, the Extreme generates hot water faster, cleaner and more efficiently than ever before.

The loading principle

We've created an interactive animation to help explain more about the loading principle

 

BENEFITS

  • Exceptional flow rates - up to 2570 litres an hour at 60 °C
  • Injection dynamics - allowing hot water draw off in minutes
  • Optimises boiler cylinder efficiency - up to 94% with a condensing boiler
  • Positive stratification - greatly reduces the risk of Legionella proliferation
  • Stainless steel cylinder with a 30 year guarantee
  • Suitable for both new build and retrofit installations
  • Design principle achieves 100% of load at 60 °C, enabling reduced storage requirement

 

FEATURES

  • Stainless steel construction
  • Fully insulated, in excess of all current standards
  • Suitable for unvented and open vented systems
  • Pre-wired controls for ease of installation
  • Available in 200, 300 and 500 litre versions

 

 
 
 

 

Technical Data
 Model Extreme 200 Extreme 300 Extreme 500
Weight (Empty) 63kg 77kg 100kg
Max Working Pressure 10 bar 10 bar 10 bar
Max Temperature 90ºC 90ºC 90ºC
DHW Flow Connection 1" 1 1/4" 1 1/2"
DHW Return Connection 1" 1" 1"
Primary Flow & Return Connections 28mm 28mm 28mm
MCWS Connection 1" 1 1/4" 1 1/2"
P&T Valve Setting 10 Bar & 90ºC
Standing Thermal Loss 137 MJ per month 163 MJ per month 182 MJ per month
Energy Efficiency Class B B B

 

Dimensions (diagram below)
 Key Extreme 200 Extreme 300 Extreme 500
 A 380mm 910mm 910mm
B 280mm 810mm 810mm
C 465mm 465mm 570mm
D 735mm 1260mm 1265mm
E 995mm 1530mm 1510mm
F 1305mm 1830mm 1995mm
G 710mm 710mm 795mm
H 300mm 300mm 300mm

 

 

MIKROFILL AT MACO

05/11/2019

The new LPHW system incorporating 3 x Ethos 110 kW condensing boilers with a combined modulation of 1 > 30 now supplies a mixture of CT and VT circuits throughout the site. In addition the stainless steel boilers also provide an indirect supply to an Extreme 200 l. . .

ALEXANDRA HALL GOES TO EXTREMES

03/10/2019

Working with Mathew Tench Architects & Associates Ltd, a new domestic hot water system was devised by established building services consultant HEVAC Design Solutions Ltd. The scheme implemented numerous Extreme loading cylinders based. . .

SHELLEY COLLEGE GOES EXTREME WITH MIKROFILL

01/08/2019

In early 2019 Huddersfield based Andrews Mechanical Services deemed the existing open vented calorifiers were to be replaced with 2 No Extreme 500 litre loading cylinders. . . .

MIKROFILL AT BASINGSTOKE FIRE STATION

05/06/2019

The existing Basingstoke Fire Station building dating back to 1966 has made way for the construction of a new £6m ultra-modern facility. The new station will accommodate improved modern living quarters, a training tower a. . .

SOUTHAM LEISURE CENTRE GOES EXTREME

04/03/2019

Established mechanical contractor A C Engineers Ltd installed 2 Extreme 500 litre stainless steel loading cylinders.. . .

MIKROFILL’S EXTREME HWS LOADING CYLINDER IS NOW AVAILABLE WITH 6 BAR CAPABILITY

02/01/2019

The pioneering ‘Extreme’ hot water loading cylinder from Mikrofill can now deliver hot water at 6 bar, nearly doubling its . . .

MIKROFILL AT WEST MIDLANDS FIRE SERVICE

02/10/2018

Following a site survey in early 2018 at Dudley Community Fire Station, it was concluded that the existing LPHW & HWS plant needed replacing with more efficient equipment.. . .

MIKROFILL AT PARKSTONE YACHT CLUB

01/08/2018

Parkstone Yacht Club in Poole was established in 1895 and is situated on the North shore of the second largest natural harbour in the world. In the summer of 2016 work started on Parkstone’s new state-of–the- art clubhouse in . . .

MIKROFILL EQUIPMENT AT SHIPSTON HIGH SCHOOL

02/07/2018

Shipston High School provides a safe, supportive and nurturing environment that enables every pupil to grow personally and academically. In 2017 the construction of a two-storey block, featuring nine new class. . .

MIKROFILL RE-PLANT AT DOBBIES

26/03/2018

Dobbies in Chesterfield is within easy reach of the Derbyshire countryside, situated just off the A616 between Balborough and Clowne. The naturally large gardening area is further complimented by a substantial aquatics department with a wo. . .