News

Show news filters
MIKROFILL AT SOUTHAMPTON UNI main image

MIKROFILL AT SOUTHAMPTON UNI

The University of Southampton is already one of the top 15 research universities in the UK and has achieved consistently high scores for its teaching and learning activities. Originally founded in 1862 and based at the Highfield Campus since 1919, Southampton University boasts eight faculties including Biological Sciences and Engineering and the Environment.
 

READ MORE

MIKROFILL GETS ITS MERRIST BADGE

02/02/2021

Designed and skilfully installed by Hampshire based contractor, Aster Building Services Ltd, the replacement equipment included three Ethos 70kW condensing boilers with a combined modulation of 20 > 1. Each boilers integral pump shu. . .

EXTREME CYLINDERS AT KINGS SCHOOL

06/01/2021

In a design build format, long standing mechanical services contractor, A&B Engineering Ltd incorporated the use of numerous Extreme hot water loading cylinders by Mikrofill. Two pairs of the WRAS approved stainless steel cylinder. . .

MIKROFILL AT ST JOHNS PRIMARY SCHOOL

01/12/2020

Following a detailed survey by the mechanical engineering team at Warwickshire County Council it was concluded that the existing LPHW system was to be updated. Part of the new design incorporated the installation of three. . .

EXTREME PERFORMANCE FOR LORD WANDSWORTH COLLEGE

03/11/2020

The decision was made to update the health and capability of the present hot water system serving both Summerfield and Hazelveare boarding houses. The existing calorifiers located in a basement plantro. . .

PRODUCTS IN ACTION MONTAGE

03/09/2020

Highlighting some of our Mikrofill 'Products in Action' from the Health, Education, Hospitality and Sports sectors.. . .

HOLIDAY INN GETS MIKROFILL PLANT UPGRADE

04/08/2020

4 No Ethos 130 kW wall mounted condensing boilers c/w a Mikrovent 750 low loss header & air/dirt separator were skilfully installed by William Austin’s. The works had to coincide with a tight schedule ensuring comp. . .

MIKROFILL EQUIPMENT ENERGISES LEISURE CENTRE

02/07/2020

The LPHW installation included 3 x Ethos 70kW wall mounted condensing boilers feeding various VT and CT circuits via a Mikrovent 250 low loss header and air/dirt separator.. . .

MEET THE TEAM - MIA BOOTH

09/06/2020

Mia’s confident personality has drawn numerous positive comments during her time on the sales team. Her previous construction trade experience is already paying dividends especially when it comes to understanding the H & V landscape.. . .