
HOLIDAY INN GETS MIKROFILL PLANT UPGRADE
4 No Ethos 130 kW wall mounted condensing boilers c/w a Mikrovent 750 low loss header & air/dirt separator were skilfully installed by William Austin's. The works had to coincide with a tight schedule ensuring complete continuity of the hotels services.READ MORE
MIKROFILL GETS ITS MERRIST BADGE
02/02/2021
Designed and skilfully installed by Hampshire based contractor, Aster Building Services Ltd, the replacement equipment included three Ethos 70kW condensing boilers with a combined modulation of 20 > 1. Each boilers integral pump shu. . .
EXTREME CYLINDERS AT KINGS SCHOOL
06/01/2021
In a design build format, long standing mechanical services contractor, A&B Engineering Ltd incorporated the use of numerous Extreme hot water loading cylinders by Mikrofill. Two pairs of the WRAS approved stainless steel cylinder. . .
MIKROFILL AT ST JOHNS PRIMARY SCHOOL
01/12/2020
Following a detailed survey by the mechanical engineering team at Warwickshire County Council it was concluded that the existing LPHW system was to be updated. Part of the new design incorporated the installation of three. . .
EXTREME PERFORMANCE FOR LORD WANDSWORTH COLLEGE
03/11/2020
The decision was made to update the health and capability of the present hot water system serving both Summerfield and Hazelveare boarding houses. The existing calorifiers located in a basement plantro. . .
PRODUCTS IN ACTION MONTAGE
03/09/2020
Highlighting some of our Mikrofill 'Products in Action' from the Health, Education, Hospitality and Sports sectors.. . .
MIKROFILL EQUIPMENT ENERGISES LEISURE CENTRE
02/07/2020
The LPHW installation included 3 x Ethos 70kW wall mounted condensing boilers feeding various VT and CT circuits via a Mikrovent 250 low loss header and air/dirt separator.. . .
MEET THE TEAM - MIA BOOTH
09/06/2020
Mia's confident personality has drawn numerous positive comments during her time on the sales team. Her previous construction trade experience is already paying dividends especially when it comes to understanding the H & V landscape.. . .
MIKROFILL SUPPLIES THORNS PRIMARY SCHOOL
02/06/2020
The existing floor standing cast iron boilers were substituted by 3 x Ethos 110kW condensing modules. The frame mounted boilers with integral shunt pumps and a combined modulation of 30 > 1 supply the existing LPHW s. . .