News

Show news filters
MIKROFILL AT ST MARKS PRIMARY SCHOOL main image

MIKROFILL AT ST MARKS PRIMARY SCHOOL

Following a dilapidation survey and redesign by Dudley Metropolitan Borough Council, the decision was made to upgrade the inefficient LPHW plant. Installed by long standing mechanical contractor, Lord Combustion Services Ltd, the equipment selected included 3 x Ethos 110 kW condensing boilers on floor standing frames coupled with a Mikrovent 400 low loss header and air/dirt separator.
 

READ MORE

MIKROFILL AT MACO

05/11/2019

The new LPHW system incorporating 3 x Ethos 110 kW condensing boilers with a combined modulation of 1 > 30 now supplies a mixture of CT and VT circuits throughout the site. In addition the stainless steel boilers also provide an indirect supply to an Extreme 200 l. . .

ALEXANDRA HALL GOES TO EXTREMES

03/10/2019

Working with Mathew Tench Architects & Associates Ltd, a new domestic hot water system was devised by established building services consultant HEVAC Design Solutions Ltd. The scheme implemented numerous Extreme loading cylinders based. . .

MIKROFILL UP FOR AN ADVENTURE WITH BEAR GRYLLS

04/09/2019

‘Bear Grylls Adventure’ at the NEC Birmingham opened in September 2018 to glowing reviews. Organisers are calling it a ‘global first adventure attraction’ because it’s so packed with challenges. . .

SHELLEY COLLEGE GOES EXTREME WITH MIKROFILL

01/08/2019

In early 2019 Huddersfield based Andrews Mechanical Services deemed the existing open vented calorifiers were to be replaced with 2 No Extreme 500 litre loading cylinders. . . .