News

ST JOHN BOSCO CATHOLIC PRIMARY SCHOOL main image
 

ST JOHN BOSCO CATHOLIC PRIMARY SCHOOL

With a new extension and the existing nursery area struggling to reach temperature, it was time for a change in the boiler department.
 
The school originally ran two coal fired boilers which were later converted to burn oil to provide LTHW heating and domestic hot water throughout.
 
With the demise of the elderly boilers and a leaking hot water cylinder, the school turned to Midlands based turn key company Structured Design & Building Ltd to provide an efficient solution.
 
The new scheme featured 2No Ethos 130 kW wall mounted stainless steel condensing boilers and a Rapide Extreme domestic hot water loading cylinder. The Extreme hot water loading cylinder ensures fast delivery and instant recovery due to its unique "Injection dynamics" technology. 
 
For more information on these and other Mikrofill products please contact the sales team on 08452 606020 or visit www.mikrofill.com 
 
 

BACK TO NEWS