News

Show news filters

HEALTH CENTRE RECEIVES EXTREME UPGRADE

07/07/2021

Netherton Health Centre - Extreme 300 Hot Water Cylinder Upgrade. . .

MIKROFILL - VELOCITY

15/06/2021

HVAC & Pressurisation specialist Mikrofill enters Water Supply market with range of multi-pump cold water boosters. . . .

MIKROFILL HEATS UP HARRIETSHAM VILLAGE HALL

05/05/2021

Mikrofill supplied a frame mounted Ethos 90 kW condensing boiler capable of modulating down to as little as 9kW and Nox levels of only 33 mg/kW. The boiler provides LPHW to each of the function rooms and commo. . .

MIKROFILL GETS ITS MERRIST BADGE

02/02/2021

Designed and skilfully installed by Hampshire based contractor, Aster Building Services Ltd, the replacement equipment included three Ethos 70kW condensing boilers with a combined modulation of 20 > 1. Each boilers integral pump shu. . .

EXTREME CYLINDERS AT KINGS SCHOOL

06/01/2021

In a design build format, long standing mechanical services contractor, A&B Engineering Ltd incorporated the use of numerous Extreme hot water loading cylinders by Mikrofill. Two pairs of the WRAS approved stainless steel cylinder. . .

 
1 Next Last