News

Show news filters

SOUTHAM LEISURE CENTRE GOES EXTREME

04/03/2019

Established mechanical contractor A C Engineers Ltd installed 2 Extreme 500 litre stainless steel loading cylinders.. . .

MIKROFILL AT HOUNSLOW TOWN PRIMARY

07/02/2019

With the need for more school places at an all-time high, a brand new five form entry school constructed by Jerram Falkus has been built in Hounslow, West London. The second phase of the build will include 284 mixed-tenure homes. . .

MIKROFILL SUPPLIES NEW PLANT AT ST MARY’S

02/01/2019

During the summer of 2018 the decision was taken to replace the existing inefficient heating plant at St Mary's Hospice with 2No Ethos FS 350 floor standing condensing boilers from Mikrofill. . . .

MIKROFILL’S EXTREME HWS LOADING CYLINDER IS NOW AVAILABLE WITH 6 BAR CAPABILITY

02/01/2019

The pioneering ‘Extreme’ hot water loading cylinder from Mikrofill can now deliver hot water at 6 bar, nearly doubling its . . .

MIKROFILL AT WALLBROOK PRIMARY SCHOOL

03/12/2018

Wallbrook Primary School is situated in Coseley, in the heart of the Black Country. The school offers an exciting curriculum for children between 5 and 11 years of age ensuring the curriculum caters for the needs of all pu. . .

WOLVES ABSORB THE PRESSURE WITH MIKROFILL

05/11/2018

The Sir Jack Hayward Ground is the first team training and academy base of Premier League football club Wolverhampton Wanderers.. . .

ANDERSON GREEN HOST CHARITY FOOTBALL MATCH

02/10/2018

Building Services Consultants, Anderson Green (Nottingham office) hosted a charity football match on Friday 31 st August in aid of Mind at Basford United FC.. . .

MIKROFILL AT WEST MIDLANDS FIRE SERVICE

02/10/2018

Following a site survey in early 2018 at Dudley Community Fire Station, it was concluded that the existing LPHW & HWS plant needed replacing with more efficient equipment.. . .