Mikrofill Hot Water Generation

EXTREME Hot Water Loading Cylinders for King's School

King’s School is one of England’s oldest independent schools, with a history stretching back for more than five centuries and a reputation for delivering outstanding...

Read Case Study

Mikrofill Boilers

ETHOS Boiler Upgrade for Midlands Arts Centre

Established in 1962, Midlands Arts Centre (MAC) is a registered charity offering regular performances such as live music concerts, plays and independent film cinema, as well as...

Read Case Study

Mikrofill Hot Water Generation

Mikrofill supply Extreme loading cylinder to Edisford Primary School

Situated in Lancashire’s beautiful Ribble Valley, Edisford Primary School provides a wide variety of exciting learning opportunities and activities for local...

Read Case Study

Mikrofill Hot Water Generation

Extreme hot water delivered by Mikrofill

Early in 2018, Ameresco Inc, a leading independent provider of comprehensive building services began a £7.5 million energy infrastructure and maintenance contract at Wexham...

Read Case Study

Mikrofill Boilers

Mikrofill at St Marks Primary School

St Marks C of E Primary School in Brierley Hill is a friendly and welcoming school with caring and supportive staff that continuously strives to improve the quality of education...

Read Case Study

Mikrofill Boilers

Mikrofill at Maco

Maco Ltd, a leading door and hardware manufacturer in Kent has recently benefitted from a new LPHW plantroom upgrade supplied by Mikrofill Systems Ltd. The current plot is home to...

Read Case Study

Mikrofill Hot Water Generation

Alexandra hall goes to Extremes

Alexandra Hall is a sea facing student accommodation on Victoria Terrace serving the historic Aberystwyth University. A comfortable bus ride from the university and a short walk...

Read Case Study

Mikrofill Hot Water Generation

Shelley College goes Extreme with Mikrofill

Shelley College, (part of the SHARE Multi-Academy Trust) is an upper school and sixth form college on the border between the villages of Shelley and Skelmanthorpe in West...

Read Case Study

Mikrofill Hot Water Generation

Mikrofill at Basingstoke Fire Station

The existing Basingstoke Fire Station building dating back to 1966 has made way for the construction of a new £6m ultra-modern facility. The new station provides modern...

Read Case Study

Mikrofill Boilers

Mikrofill at John Black Day Hospital

Birmingham and Solihull Mental Health NHS Foundation Trust provides mental health care to residents of Birmingham, Solihull and to communities in the West Midlands and...

Read Case Study

Mikrofill Hot Water Generation

Southam Leisure Centre goes Extreme

Following the demise of the existing direct gas fired hot water plant at Southam Leisure Centre, the building has recently benefitted from new HWS generation equipment...

Read Case Study

Mikrofill Boilers

Mikrofill at Hounslow Town Primary

With the need for more school places at an all-time high, a brand new five form entry school constructed by Jerram Falkus has been built in Hounslow, West London. The...

Read Case Study

Mikrofill Boilers

Mikrofill supplies new plant at St Mary's

Birmingham’s St Mary’s Hospice provides vital care and support to people and their loved ones who are living with life-limiting illness. Every day the hospice cares...

Read Case Study

Mikrofill Boilers

Mikrofill at Wallbrook Primary school

Wallbrook Primary School is situated in Coseley, in the heart of the Black Country. The school offers an exciting curriculum for children between 5 and 11 years of age ensuring...

Read Case Study

Mikrofill Hot Water Generation

Mikrofill at West Midlands Fire Station

Following a site survey in early 2018 at Dudley Community Fire Station, it was concluded that the existing LPHW & HWS plant needed replacing with more efficient...

Read Case Study

Mikrofill Hot Water Generation

Mikrofill at Parkstone Yacht club

Parkstone Yacht Club in Poole was established in 1895 and is situated on the North shore of the second largest natural harbour in the world. In the summer of 2016 work started on...

Read Case Study

Mikrofill Boilers

Mikrofill equipment at Shipston High School

Shipston High School provides a safe, supportive and nurturing environment that enables every pupil to grow personally and academically. In 2017 the construction of a two-storey...

Read Case Study

Mikrofill Pressurisation

Mikrofill updates medieval castle

The land that Hartlebury Castle sits on was granted to the Bishop of Worcester by King Burghred in the late 9th century, although the foundations of the existing building are...

Read Case Study

Mikrofill Boilers

Mikrofill equipment at Palace Theatre

The Palace is a 420 seat theatre with a Grade 2 listed auditorium situated in the heart of Redditch’s town centre. Operated by Place Partnership the theatre boasts all the...

Read Case Study

Mikrofill Boilers

Mikrofill re-plant at Dobbies

Dobbies in Chesterfield is within easy reach of the Derbyshire countryside, situated just off the A616 between Balborough and Clowne. The naturally large gardening area is further...

Read Case Study

Mikrofill Boilers

Mikrofill at Goodyers End Primary school, Warwickshire

Under the umbrella of Warwickshire County Council the decision was made to replace the existing LPHW heating plant at the school. The existing boilers and associated ancillaries...

Read Case Study

Mikrofill Boilers

Mikrofill at Club 3000 Bristol

With a dozen clubs nationwide, Club 3000 Bingo in Bristol is the latest branch to benefit from a plantroom overhaul. The existing inefficient equipment was removed from site to...

Read Case Study

Mikrofill Boilers

Mikrofill supply British Gypsum

British Gypsum, part of the Saint-Gobain group, is the UK’s leading manufacturer of interior lining systems. The company produces gypsum based products including plaster,...

Read Case Study

Mikrofill Hot Water Generation

Mikrofill at Aureus school

 Aureus School is a STEM specialist mixed school that creates choice for the wider community in southern Oxfordshire. The schools mission is simple: we will strive to educate...

Read Case Study

Mikrofill Boilers

Major upgrade to Handsworth fire station hot water and heating system

Following a survey by the engineering division of West Midlands Fire Service, it was determined that the existing LPHW heating plant at Handsworth Fire Station in Birmingham was...

Read Case Study

Mikrofill Hot Water Generation

Mikrofill at the National Sea Life Centre

Designed by Sir Norman Foster, The National Sea Life Centre is an aquarium with over 60 displays of freshwater and marine life in Brindley Place, Birmingham.  Its ocean tank...

Read Case Study

Mikrofill Hot Water Generation

Health Centre receives Extreme upgrade

Located in the heart of the West Midlands, Netherton Health Centre has recently benefitted from a hot water service upgrade by long standing building services contractor TDR...

Read Case Study

Mikrofill Pressurisation

Mikofill heats up Harrietsham village hall

Noted in the Doomsday book, Harrietsham is a rural village nestling in the North Downs, seven miles east of Maidstone. Built in the 1990’s the village hall has three...

Read Case Study

Mikrofill Boilers

Mikofill gets its merrist badge

‘Merrist Wood College, part of Active Learning’ is a 400-acre award winning institution specialising in land-based industries. Located near Guildford, it is widely...

Read Case Study

Mikrofill Hot Water Generation

Extreme cylinders at Kings School

King’s School is one of England’s oldest independent schools, with a history stretching back for more than five centuries and a reputation for delivering outstanding...

Read Case Study

Mikrofill Boilers

Mikrofill at St Johns Primary School

St John’s Primary School (part of the Warwickshire Primary Partnership) lists having a culture of transparency, trust and a shared commitment to mental health and wellbeing...

Read Case Study

Mikrofill Hot Water Generation

Extreme performance for Lord Wandsworth College

Around an hour’s drive from London and set in 1200 acres of rolling countryside on the North Hampshire and Surrey border sits Lord Wandsworth College. The boarding and...

Read Case Study

Mikrofill Boilers

Holiday Inn gets a Mikrofill upgrade

Following an in depth site survey at The Holiday Inn hotel in Bromsgrove by William Austin’s Ltd, it was concluded that the LPHW plant urgently needed...

Read Case Study

Mikrofill Boilers

Mikrofill equipment energises leisure centre

Construction work began at the site of the new Market Rasen Leisure Centre in Lincolnshire in spring 2019 and is now complete and fully operational. Owned by West Lindsey...

Read Case Study

Mikrofill Boilers

Mikrofill supplies Thorns Primary School

Built in the 1960’s to serve the surrounding community, Thorns Primary School is situated in the south west corner of the West Midlands conurbation in the area...

Read Case Study

Mikrofill Boilers

Mikrofill by the Sea Life

Designed by Sir Norman Foster, The National Sea Life Centre is an aquarium with over 60 displays of freshwater and marine life in Brindley Place, Birmingham. Its ocean tank has...

Read Case Study