Located in the heart of the West Midlands, Netherton Health Centre has recently benefitted from a hot water service upgrade by long standing building services contractor TDR Mechanical Services Ltd.

Mikrofill Systems supplied an indirect Extreme 300 hot water loading cylinder that serves all areas in the building including the treatment rooms, assessment clinic and covid support area. This was a quick turnaround project for TDR as the existing cylinder had failed and the Extreme was ex-stock from Mikrofill.

The stainless-steel unvented cylinder maximises a condensing boilers efficiency by managing its primary input at a Δt of 30°C (80/50°C). The Extreme 300 can produce as much as 2370 l/hr at 60°C and an instantaneous performance of 34.5 l/m at 60°C.

The Extreme was also supplied with an unvented kit capable of operating up to 6 bar and a back up immersion heater.