Wallbrook Primary School is situated in Coseley, in the heart of the Black Country. The school offers an exciting curriculum for children between 5 and 11 years of age ensuring the curriculum caters for the needs of all pupils, whatever their interests and ability. Wallbrook also has a Foundation Stage incorporating ‘Little Ducklings’ pre-school which offers 52 places for children aged 3 and 4 with highly trained staff and a bright and cheerful learning environment.
In the spring of 2018 it was concluded by Dudley Metropolitan Borough Council that the existing LPHW heating plant was to be replaced. Long established contractor TDR (Mechanical Services) Ltd installed 3 x Ethos 130kW wall mounted condensing boilers. Installed on free standing frames and coupled to a Mikrovent 750 low loss header/air and dirt separator the boilers provide LPHW to the schools main hall, north/south wings and administration block. The stainless steel boilers have a combined modulation of 30 > 1 (390 > 13kW) and nox levels of 33mg/kw. In addition the new installation was complimented by a Mikrofill 600 pre-commissioned pressurisation package.
Wallbrook also has its very own nature reserve – Seagull Bay which has a large pond, meadow and wooded area. This allows children to explore a wide range of environments, enhancing their learning experiences.
For more information on these and other Mikrofill products please contact the sales team on 03452 606020 or visit www.mikrofill.com