Following a site survey in early 2018 at Dudley Community Fire Station, it was concluded that the existing LPHW & HWS plant needed replacing with more efficient equipment.
Leading building services consultancy Davies Partnership collaborated with West Midlands Fire to select Mikrofill equipment to cover the stations LPHW & HWS demands. This included 3No Ethos 110kW stainless steel condensing boilers providing both heating and indirect LPHW to 2No 500L Extreme HWS loading systems.
The Extreme is a domestic hot water generator that combines the advantages of both an instantaneous hot water heater and a storage system. The efficiency of the Ethos 110kW boilers is maximised whilst providing indirect LPHW to the cylinder as the Extreme is designed to operate at a Δt of 30°C. Based on a prioritised input of 110kW at 80°C each Extreme 500 will produce in excess of 2350 l/hr and 800 litres in a 10 minute period at 60°C.
The new installation was carried out by established contractor Senate Mechanical Ltd.
For more information on these and other Mikrofill products please contact the sales team on 03452 606020 or visit www.mikrofill.com