Situated in Lancashire’s beautiful Ribble Valley, Edisford Primary School provides a wide variety of exciting learning opportunities and activities for local pupils. Central to the school’s belief is that the pupils learn best through first-hand experience and focused teaching.

During the summer of 2019, Lancashire County Council decided to make some plant changes at Edisford which incorporated modifications to the existing HWS system. This included the installation of a single stainless steel Extreme 500 litre loading cylinder c/w unvented kit.

Skilfully installed by CPL Heating & Plumbing Ltd the Extreme’s plate heat exchanger is designed to operate at a Δt of 30°C (80/50°C) therefore optimising a condensing boilers performance when indirectly supplying LPHW. In addition, the Extreme is also available in 200 & 300 litre formats with each loading cylinder capable of producing a maximum instantaneous performance of 34.5 l/m at 60°C.

For more information on these and other Mikrofill products please contact the sales team on 03452 606020 or visit www.mikrofill.com