The ageing heating plant at Malinsgate Police station in Telford was recently replaced with 6 No Ethos 130kW wall mounted condensing boilers with integral shunt pumps.

The stainless steel boilers were installed c/w a Mikrovent low loss header/air and dirt separator, a pre commissioned Mikrofill 1000/2 pressurisation package and a modular frame kit.

Much to the satisfaction of the client, all services were maintained throughout the 6 week project thanks to the phased design programme by prominent services consultant ESDP Ltd and the conscientious approach of the mechanical installer Lord Combustion Services Ltd. The new equipment supplies LTHW to both CT and VT systems within the station serving a mixture of radiators, fan convectors, AHUs and an existing DHWS circuit.

The boilers integral “cascade” controller manages the collective modulation of 13 > 780kW and delivers a seasonal efficiency in excess of 95%.