Construction work began at the site of the new Market Rasen Leisure Centre in Lincolnshire in spring 2019 and is now complete and fully operational.

Owned by West Lindsey District Council (WLDC), the centre’s building services performance design was carried out by BEC (Nottingham) with the full design/installation responsibility going to East Kirkby Engineering Ltd (EKE).

The LPHW installation included 3 x Ethos 70kW wall mounted condensing boilers feeding various VT and CT circuits via a Mikrovent 250 low loss header and air/dirt separator. The HWS demand is catered for by the appointment of a 500 litre Extreme loading cylinder that is capable of producing a continual flow of 34.5 l/m at 60°C and over 2500 l/hr. In addition the Extreme maximises the efficiency of a condensing boiler by operating at a ΔT of 30°C (80/50).

Inside the centre boasts a health club with a 40-station gym floor, multi-use fitness studios, dance studio, a four-court sports hall and an events space. Outside facilities include a fantastic 3G football pitch.

For more information on these and other Mikrofill products please visit www.mikrofill.com or call the sales team on 03452 606020.